Customization: | Available |
---|---|
Application: | Transportation, Precast Concrete |
Certification: | CE, ISO |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Specification
1) Product: Lifting socket,lifting insert,bend and waved socket, transport socket,flat socket ,socket with bar and so on.
2) Diameter: M / RD 12 - 36mm
3) Length: 40 - 200mm
4) Capacity: 0.5 - 12.5MT
5) Material: stainless 304/316, ST52.3
6) Surface: plain, galvanized
Type | Thread | Type | Thread | Load | Full SWL | Dimensions | Weight | Quantity | ||
THL-M | THL-Rd | Rate | Kg | t | h ( ca ) | wire rope | per | |||
M | Rd | t | mm | mm | diam. mm | Kg / 1 | BOX | |||
THL-M12 | 12 | THL-Rd12 | 12 | 0.5 | 500 | 22 | 155 | 6 | 0.10 | 50 |
THL-M16 | 16 | THL-Rd16 | 16 | 1.2 | 1200 | 27 | 155 | 8 | 0.14 | 25 |
THL-M20 | 20 | THL-Rd20 | 20 | 2.0 | 2000 | 35 | 215 | 10 | 0.28 | 25 |
THL-M24 | 24 | THL-Rd24 | 24 | 2.5 | 2500 | 43 | 255 | 12 | 0.50 | 20 |
THL-M30 | 30 | THL-Rd30 | 30 | 4.0 | 4000 | 56 | 300 | 16 | 1.00 | 10 |
THL-M36 | 36 | THL-Rd36 | 36 | 6.3 | 6300 | 68 | 340 | 18 | 1.45 | - |
THL-M42 | 42 | THL-Rd42 | 42 | 8.0 | 8000 | 80 | 425 | 20 | 2.00 | - |
THL-M52 | 52 | THL-Rd52 | 52 | 12.5 | 12500 | 97 | 550 | 26 | 3. |
2. Primary Competitive Advantages:
More than 10 years focus on building material manufacturing
Prompt Delivery time within 25days after confirming order
Fluido's products are enhanced by the QA and Quality Control checks during the production. If necessary each order can be send out with a certificate referring back to test.
Precast concrete elements may be lifted several times after casting and during storage and erection-by using this system, the designer and the worker manager ensure that each lift is carried out safely and quickly.