Application: | Precast Concrete |
---|---|
Certification: | CE, ISO |
Surface Treatment: | No |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Item | Rubber Recess Former | |
Material | Rubber | |
Color | Plain, black ,blue,yellow | |
Consist of | Each rubber recess former requires one wing nut, plate, and stud set to attach it | |
Load Capacity | 1.3T, 2.5T (2T), 4.0T,5.0T,7.5T,10.0T (8.0T),15.0T, 20.0T,32.0T,45.0T etc. | |
Design Instruction | In order to ease the iden-tification of the load group the formers are produced in different colors. Recess formers are used with threaded plates which may be either rod a socket. | |
Test | CE&ISO 9001 | |
Advantage | 1)More than 10 years experience | |
2)The rubber recess former is constant in shape even when heated up tp 120 ºC or in contact with oil.It can be used several times. | ||
3)Professional inspectors, make rension test before shipping | ||
4)Customer complaints less than 1% | ||
Application | Rubber recess former for precast anchor can receive all our anchors in load groups of 1.3T to 45T.The features are as follows: 1) 4-Hole recess former 2) Fast, accurate installation due to the positioning 4 holes 3) Easy to be fastened to the formwork with the mounting plate 4) Protects the anchor head from the concrete 5) High grade plastic ensures durability of the former |
|
Relevant Products | -lifting eye,rubber recess former,lifting socket,lifting insert,lifting Loop,spread anchor etc. -These construction accessories widely vary in application including connecting, reinforcing and fastening building components. |
Advantages:
(1)More than 10 years experience for precast concrete systems manufacturing and trading.
(2) compliance with strict technical requirements to fit the demand for human safety in the market. ( Precast concrete elements may be lifted several times after casting and during storage and erection-by using this system the designer and the worker manager ensure that each lift is carried out safely and quickly. Failure to use a designed and co-ordinated system could result in material breakage at some point during the production/delivery process.)
(3)Fluido's products are enhanced by the factory Quality Control checks during the production. If necessary each order can be send out with Tension Test.
(4)OEM/ODM Capability: Fluido has more then 10 years experience for the OEM/ODM products, more than 150 cooperation factory, we can provide you competitive price and steady quality.
Suppliers with verified business licenses